Main menu:
Pressure Equipment and electromechanical process equipment
The service aims to timely monitoring and complete reporting of inspection and testing planned.
The service includes the review and verification of the specifications and requirements for the design, manufacture, inspection, testing and certification in accordance with the DIRECTIVE 2014/68 / EU, for pressure equipment and assemblies for the chemical industry, for the industry food, for the control systems and implementation (HPCU) of refinery valves, of the hydroelectric power plant control systems, pneumatic systems (eg. of charging devices conditioners, calibration systems with safety valves), heat exchangers, systems for cryogenic systems, pressurized systems operating in creep conditions (eg. refinery valves such slide valves, two-
The customer is informed immediately via the Daily Report (or interim report), of the Final Report and the Certificate of Release issued at the closure of all activities to the manufacturer.
Ask for more information.
Below are shown some significant monitoring stages in the case of refinery valves.
GRP products, or other composite materials
The service offers the complete reporting of inspection and testing activities planned, also includes the review and verification of the specifications and requirements applicable to the design, manufacture, inspection, testing and certification (ISO 14692 or other applicable standards or codes) for tanks, FRP pipes and fittings.
The customer is informed immediately via the Daily Report (or interim report), the Final Report and Release Certificate.
The following table shows some monitoring phases for pipes, fittings and tanks FRP.